| 16/10/2026 |
Biomass Cabins And Fuel Supply |
High |
17/11/2026 |
| 16/10/2026 |
Building Services For Renovation |
High |
11/11/2026 |
| 16/10/2026 |
Civil Engineering Framework Agreement |
High |
16/11/2026 |
| 16/10/2026 |
Biomass Cabins And Fuel Supply |
High |
17/11/2026 |
| 16/10/2026 |
Biomass Cabins And Fuel Supply |
High |
18/11/2026 |
| 16/10/2026 |
Housing Design-build |
High |
16/11/2026 |
| 15/10/2026 |
Psychiatry Seclusion Room Upgrade |
Low |
06/11/2026 |
| 15/10/2026 |
Fitout And Renovations For Hub |
Low |
24/11/2026 |
| 15/10/2026 |
Archaeological Consultancy Services Scheme |
High |
20/11/2026 |
| 15/10/2026 |
Domestic Violence Refuge And Housing |
High |
25/11/2026 |
| 14/10/2026 |
Port Redevelopment And Construction Works (Ireland) |
High |
27/11/2026 |
| 14/10/2026 |
Residential Housing Development Projects |
High |
16/11/2026 |
| 13/10/2026 |
Roof Replacement And Conservation (Ireland) |
Low |
13/11/2026 |
| 13/10/2026 |
Asbestos Roof Works (France) |
Low |
09/11/2026 |
| 13/10/2026 |
Roof Asbestos Removal And Replacement (France) |
Low |
09/11/2026 |
| 13/10/2026 |
Cemetery Roof Maintenance Works (Italy) |
Low |
21/10/2026 |
| 13/10/2026 |
Generator Supply - Montserrat |
Low |
02/11/2026 |
| 13/10/2026 |
Second-hand Wheel Loader Supply |
Low |
03/11/2026 |
| 13/10/2026 |
Geogrid And Geotextile Materials |
High |
16/11/2026 |
| 13/10/2026 |
LED Lighting And Generator Upgrade |
High |
12/11/2026 |
| 13/10/2026 |
Automated Public Toilets Supply |
High |
09/11/2026 |
| 12/10/2026 |
Engineering Consultancy For Link Road |
Low |
11/11/2026 |
| 12/10/2026 |
Lidar Topographical Survey Services |
Low |
26/10/2026 |
| 12/10/2026 |
Works Contractor For Conservation |
High |
12/11/2026 |
| 12/10/2026 |
Self Catering Accommodation Works |
Low |
27/10/2026 |
| 12/10/2026 |
Painting Of Walkway Tower Section (Ireland) |
Low |
20/11/2026 |
| 12/10/2026 |
Consulting Engineering Services For Water Scheme |
Low |
02/11/2026 |
| 12/10/2026 |
Water Scheme Upgrade Works |
Low |
10/11/2026 |
| 12/10/2026 |
Fish Pass Options Assessment |
High |
08/11/2026 |
| 12/10/2026 |
Flood Relief Framework And Works |
High |
13/11/2026 |
| 12/10/2026 |
Flood Relief Consultancy Services |
High |
02/11/2026 |
| 12/10/2026 |
Design And Build Housing Units |
High |
10/11/2026 |
| 12/10/2026 |
Architectural Design For Heritage Project |
High |
06/11/2026 |
| 10/10/2026 |
Office Reconfiguration And Fitout (Malaysia) |
High |
23/10/2026 |
| 09/10/2026 |
Demolition Of Office And Cottage |
Low |
23/10/2026 |
| 09/10/2026 |
Urban Regeneration Prequalification Scheme |
Low |
04/11/2026 |
| 09/10/2026 |
Ground Investigation For Hospital Works |
Low |
23/10/2026 |
| 09/10/2026 |
Science Classroom Refurbishment |
Low |
30/10/2026 |
| 09/10/2026 |
Architect-led Design For Fire Station |
High |
11/11/2026 |
| 09/10/2026 |
Architect-led Design For Redevelopment |
High |
06/11/2026 |
| 09/10/2026 |
1 Tonne Excavator Supply |
Low |
30/10/2026 |
| 08/10/2026 |
Framework For Minor Civil Works |
Low |
06/11/2026 |
| 08/10/2026 |
Design Team For Community Dwelling (Republic of Ireland) |
Low |
13/11/2026 |
| 08/10/2026 |
Demolition Of Office And Cottage |
Low |
22/10/2026 |
| 08/10/2026 |
Auxiliary Boiler Replacement Project |
High |
05/11/2026 |
| 07/10/2026 |
Tools And Hardware Framework |
Low |
10/11/2026 |
| 07/10/2026 |
3-metre Road Grader Supply |
Low |
28/10/2026 |
| 07/10/2026 |
Design And Build Contract - Prior Information Notice |
PinLow |
20/10/2026 |
| 07/10/2026 |
Geothermal Engineering Consultancy Framework |
High |
05/11/2026 |
| 07/10/2026 |
Healthcare And Nursing Lab Fit Out |
High |
04/11/2026 |
| 07/10/2026 |
Greenway Construction And Improvements |
High |
12/11/2026 |
| 07/10/2026 |
Veterinary Medical Facility Construction |
High |
09/11/2026 |
| 07/10/2026 |
School Building Demolition And Clearance |
Low |
06/11/2026 |
| 07/10/2026 |
Asbestos Roof Removal And Replacement (Belgium) |
Low |
27/10/2026 |
| 06/10/2026 |
Facilities Management Services Engagement (Trinidad and Tobago) - Preliminary Market Engagement Notice |
PinHigh |
23/10/2026 |
| 06/10/2026 |
Outdoor Rehabilitation Space Works |
Low |
30/10/2026 |
| 06/10/2026 |
Mains Extension |
Low |
27/10/2026 |
| 06/10/2026 |
Landscape And Biodiversity Project |
Low |
05/11/2026 |
| 06/10/2026 |
Workshop Refurbishment And Extension |
Low |
04/11/2026 |
| 06/10/2026 |
Automotive Training Equipment Supply |
High |
06/11/2026 |
| 06/10/2026 |
Technical Advisors For Timber DPS |
High |
28/02/2032 |
| 05/10/2026 |
Painting Works For Pilot Plant |
Low |
19/10/2026 |
| 05/10/2026 |
Housing Construction And Apartment Creation |
Low |
06/11/2026 |
| 05/10/2026 |
Construction Of Two Fire Stations |
High |
12/11/2026 |
| 05/10/2026 |
Light Rail Design And Construction |
High |
14/12/2026 |
| 05/10/2026 |
MEICA Works Market Engagement - Prior Information Notice |
PinLow |
20/10/2026 |
| 05/10/2026 |
School Extension And Site Works |
Low |
26/10/2026 |
| 05/10/2026 |
Minor Construction Works Framework |
Low |
26/10/2026 |
| 05/10/2026 |
Building Restoration And Conservation |
Low |
06/11/2026 |
| 02/10/2026 |
Interior Upgrades And Alterations |
Low |
23/10/2026 |
| 02/10/2026 |
Locksmith And Door Repair Services |
Low |
23/10/2026 |
| 02/10/2026 |
Heating Upgrades And Site Works |
Low |
23/10/2026 |
| 02/10/2026 |
Town Centre Refurbishment Works |
Low |
19/11/2026 |
| 02/10/2026 |
Biomass Heating And Upgrades |
Low |
23/10/2026 |
| 02/10/2026 |
Network Upgrade And Connections |
Low |
30/10/2026 |
| 02/10/2026 |
Design Team For Transport Hub |
High |
06/11/2026 |
| 02/10/2026 |
Framework For Project Management Services |
High |
02/11/2026 |
| 02/10/2026 |
Mechanical And Carpentry Services |
High |
11/11/2026 |
| 02/10/2026 |
Stormwater Remediation Framework |
Low |
19/10/2026 |
| 02/10/2026 |
School Accommodation And Upgrades |
Low |
22/10/2026 |
| 01/10/2026 |
Plumbing Training Workshop Construction |
Low |
27/10/2026 |
| 01/10/2026 |
Electrical Upgrades For Brewing Centre |
Low |
22/10/2026 |
| 01/10/2026 |
Turnkey Starter Homes Development - Prior Information Notice |
PinLow |
31/12/2026 |
| 01/10/2026 |
Pier Structural Repairs |
Low |
22/10/2026 |
| 01/10/2026 |
Flood Prevention And Structural Works |
Low |
02/11/2026 |
| 01/10/2026 |
Padel Court Design And Installation |
Low |
30/10/2026 |
| 01/10/2026 |
Residential Units Construction |
Low |
30/10/2026 |
| 01/10/2026 |
Flood Defence Design Framework |
High |
30/10/2026 |
| 30/09/2026 |
Biomass Heating And Building Works |
Low |
22/10/2026 |
| 30/09/2026 |
Arborist Facility Construction Works |
Low |
28/10/2026 |
| 30/09/2026 |
Building Conservation And Repairs |
Low |
22/10/2026 |
| 30/09/2026 |
Heat Pump Works For Schools |
Low |
21/10/2026 |
| 30/09/2026 |
Construction Of Residential Units |
Low |
30/10/2026 |
| 30/09/2026 |
Window And Door Replacement Works |
High |
29/10/2026 |
| 30/09/2026 |
Heat Pump Works For Schools |
High |
02/11/2026 |
| 30/09/2026 |
Public Realm And Building Works |
High |
30/10/2026 |
| 30/09/2026 |
Station Capacity Enhancement Works |
High |
20/11/2026 |
| 29/09/2026 |
Engineering Consultancy For Link Roads |
Low |
06/11/2026 |
| 29/09/2026 |
Bridge Barrier Mitigation Consultancy |
Low |
21/10/2026 |
| 29/09/2026 |
School Safe Routes Scheme |
Low |
19/10/2026 |